Attention investors!

Administration of municipal formation Kavkazsky district invites potential investors to cooperation in the framework of the XV International investment forum "Sochi-2016".
Kavkazsky district is located in the North – Eastern part of the Krasnodar region. The area is 1227,4 sq. km Administrative centre – the city of Kropotkin. Remoteness from the city of Kropotkin of Krasnodar – 141 km.
On the territory of the region flow four rivers. The Kuban river is not navigable, the rivers Chelbas, Beysug and Kalala is formed by a cascade of ponds. Within the boundaries of the region there are 67 lakes and reservoirs, totaling 2.9 million m3. the total area of water mirror 128 hectares in state ownership.
On the territory of the Kavkazsky district received the development of road, rail and pipeline transport.
The district is part of the Federal highway M-29 "Caucasus" with a length of 24.6 km, which forms the main transit cargo traffic in the direction of the Meridian. Transport links in the area in the latitudinal direction forms a highway Temryuk —
Krasnodar – Kropotkin - border of Stavropol territory (intensity reaches 7700 auth/day).
The regional center - the city of Kropotkin is a large railway junction and is situated at the intersection of 4 railway lines: "the Kavkazskaya-Krasnodar", "Kavklazskaya-Tikhoretsk", "Kavkaz-Armavir", "Kavkazskaya-Stavropol". In the town of Kropotkin has a railway station of higher rank. The length of Railways in the district is 80 km away.
In the structure of the transport complex of Kavkazsky district is represented by the sub sector "transport via pipelines". Through the territory of region is crossed by the tracks of trunk pipelines of JSC "Caspian pipeline consortium-R" and "terrible Labor", total length 77,0 km.
Administration of municipal formation Kavkazskiy district prepared the following investment proposals:
- 8 sites planned for implementation on the land plots with a total area of 23.4 ha, including:
1. Construction of a workshop for sewing seat covers and mats (POS.);
2. Construction of automobile logistics terminal (Kropotkin);
3. The construction of a complex of roadside service. STO 1 post wash 1 post, store (St. Temizhbekskaya);
4. Construction of vegetable store (Kropotkin);
5. The construction of the center active recreation and entertainment (POS. im. M. Gorky);
6. Construction of gas stations (Kropotkin);
7. The construction of the Park extreme sports (Kropotkin);
8. The construction of the Creamery (Kropotkin).
In the framework of the International investment forum "Sochi-2016" to potential investors will be presented to only 5 sites (located in the town of Kropotkin).

- 5 investment projects worth 1.4 bn RUB. on the land plots with a total area of 9.96 ha, including:
Construction of dairy farm:
Project capacity: 400 cows, milk production – 2 880 tons per year, production of beef – 32 tons per year, Total project cost 88.8 million RUB payback Period of 3.5 years.
Address location: Kavkazsky district, Privolnoye rural settlement, H. Vnukovo, 500m North of Vnukovo H., 200m East of the river Chelbas, the place of the former MTF OAO im. Michurina; – land area of 31000 sq. m.
The construction of a plant for the production of vegetable and fruit juices:
The design capacity production of 27.8 thousand tons of finished products per year, including:
- tomato juice – 6,28 thousand tons;
- Apple juice – 6.6 thousand tons;
- grape juice – of 2.12 thousand tons;
- carrot juice – 7.3 thousand tons;
- pumpkin juice – of 5.48 thousand tons.
The total project cost 858,6 million RUB payback Period to 4.75 years.
Address location: Kavkazskiy rayon, Kropotkin,
street Network, 49; square footage – 35329 sq. m.
The construction of a factory for the manufacture of metal products:
Project capacity: the manufacture of metal construction – 9,63 thousand tons per year, manufacture transmission towers, communication – 9,63 thousand tons per year, production of road barriers – 5,5 thousand tons per year. The total project cost 225,5 million. The payback period of 3.75 years.
Address location: Kavkazskiy rayon, Kropotkin, machine-building, 40/proezd 4 promishlenniy, 8; land area – sq. m 21202
The construction of a plant for drying and freezing of agricultural products: Project capacity: the processing of up to 4120 tons of vegetables and 2 998 tons of fruit per year and the production of following products: frozen tomatoes, potatoes, cauliflower, mushrooms, frozen vegetable mix, frozen fruit - apples, cherries, plums, pears, and dried fruits - cherry, strawberry, plum and apricot. The total project cost of 54.6 million rubles, the payback period is 2.75 years.
Address location: Kavkazskiy rayon, g. Kropotkin, ul. Setevaya, 64; square footage – 29113 sq. m.
Complex low-rise construction:
Project capacity: the project proposes an integrated low-rise buildings on two plots with an area of 2200 sq. m 2000 sq. m. construction – brick townhouses (a total of 20 apartments at 110 sq m each). The total project cost 77,52 million RUB payback Period to 1.54.
Address location: Kavkazskiy rayon, Kropotkin, travel
1st street New 4, travel 1 th street New, 2; plot size – 4200 sq. m.

More information about the municipality and about investment proposals of the municipal formation Kavkazskiy district placed on the investment portal of the Kavkazsky district - www.kavkaz-invest.ru.
Contact phone - the chief of Department of investments and development of small and medium enterprise administration of Kavkazsky district Danilova Natalia Sergeevna tel: (886138) 6-17-08, e-mail: kavinvest@yandex.